JAMBCommerceHome Trade2016
JAMB Commerce Practice Question
medium
Question:
The cost which is incurred asa result of failure to load or unload a ship at the ports within a specified period is referred to as
The cost which is incurred asa result of failure to load or unload a ship at the ports within a specified period is referred to as